Parex (Sika) EWI Systems

Parextherm Technical Handover &
Warranty Evidence Platform

Standardize technical handover documentation for Parextherm (mineral and EPS) and Parexdry systems. Log pull-out test data, Maite basecoat embedment, and DPR finish batch codes for swift warranty validation.

Engineered for Parex Maite & DPR Finishes

Parex systems require rigorous quality control on substrate preparation, mechanical fixing schedules, and Maite basecoat embedding. Overlooking a single stage photograph can hold up warranty issue by weeks.

CertFile provides your on-site installers with a direct checklist tailored for Parextherm and Parexdry specifications, creating an immutable technical dossier ready for manufacturer sign-off.

Substrate Pull-Out Records

Log anchor pull-out test kilonewton (kN) readings.

Parex Maite Basecoat Depth

Photo evidence of wet-on-wet mesh embedment.

Window Cill & Flashing Details

Verify expanding foam tape seals and drip beads.

DPR Topcoat Batch Logs

Record batch numbers, primer coats, and drying conditions.

Parex Technical Handover Workflow

Step-by-step evidence capture and dossier compilation for Parex approved contractors.

01

Substrate & Fixing Audit

Log masonry condition, pull-out test values, base track levelling, and insulation board staggered layout.

02

Reinforcement & Details

Capture photographic evidence of Maite basecoat, mesh lap alignment, stress patches, and cill seals with GPS seals.

03

Dossier Compilation

Generate the completed Parex warranty dossier, installer compliance declaration, and homeowner care guide in one click.

Parex Technical FAQ

Common questions on documenting Parex EWI systems.

Deploy Parex Project Documentation

Start generating Parex-compliant technical handover packs and warranties today.