Adjacent Thermal Envelope System

ICF Technical Handover &
Pour Verification Platform

Eliminate structural ambiguities and handover friction. CertFile standardizes Insulated Concrete Formwork (ICF) technical records: concrete pour logs, rebar placement verification, slump tests, and thermal envelope sign-off.

Engineered for ICF Engineering Quality Control

Structured for structural engineers, building control officers, warranty providers, and main contractors.

Pour & Slump Logs

Record concrete mix design (C28/35), slump test readings, pour lift heights (max 1.2m per pass), batch delivery tickets, and mechanical vibration records.

Rebar & Core Verification

GPS-stamped photographic evidence of horizontal and vertical reinforcement bars, lap splice lengths, lintel rebar cages, and corner ties prior to concrete pour.

Thermal Envelope Handover

Document window opening bucks, EPS rasping, direct-applied render basecoat compatibility, and final airtightness interface detailing.

ICF Technical Handover Workflow

From foundation dowels to top-of-wall concrete sign-off.

01

Pre-Pour Inspection

Log foundation starter bars, alignment bracing, window bucks, horizontal rebar placement, and service conduit cast-ins.

02

Pour Day Execution

Record concrete delivery tickets, slump test measurements, lift increments, consolidation logs, and anchor bolt placements.

03

Engineering Handover Dossier

Generate an immutable technical handover dossier with full photo trails, concrete cube test results, and engineer sign-off signatures.

ICF Technical FAQ

Answers to common questions regarding ICF technical documentation.

Deploy ICF Technical Documentation

Equip your concrete formwork teams with structured pour logs and engineering handover packs today.